New Pantai Expressway – road closure from May 15-16

npe-map-overview

Portions of the E10 New Pantai Expressway (NPE), specifically from KM 0.6 to KM 1.8 in both directions, from May 15 at (beginning from 10pm) to May 16 (ending at 5am). The cause for the closure is to facilitate construction works involving an overhead bridge by the Sunway Group at KM 1.6.

“NPE users are advised to use alternative routes available, take heed of the safety signboards and observe the stipulated speed limit,” said NPE Sdn Bhd in a statement issued. Motorists who required further information are required to contact the NPE at its hotline, 1300-88-1010.

Looking to sell your car? Sell it with Carro.

10% discount when you renew your car insurance

Compare prices between different insurer providers and use the promo code 'PAULTAN10' when you make your payment to save the most on your car insurance renewal compared to other competing services.

Car Insurance

Gregory Sze

An “actor” by training, Gregory Sze realised that he has had enough of drama in his life. Following his number one passion (acting was actually number two), he decided to make the jump into the realm of automotive journalism. He appreciates the simple things in life – a simple car with nothing but back-to-basics mechanical engineering and minimal electronics on board.

 

Comments

 

Add a comment

required

required