Paul Tan's Automotive News
 
  • Home
  • BM
    • Berita Tempatan
    • Pandu Uji
    • Rencana Khas
    • Motosikal
  • 中文
  • Bikes
    • Local Bike News
    • Bike Reviews
  • M’sian News
    • New Car Launches
  • EVs
  • Car Reviews
  • Buy a Car
    • Certified Pre-Owned
    • Car Classifieds
    • Zeekr
  • Sell My Car
  • Car Prices
  • Spyshots
  • Videos
    • Walk-Arounds
    • Video Reviews
    • Driven
    • PT Talks
  • Tools
    • Car Loan Calculator
    • Road Tax Calculator
    • EV Road Tax Calculator
    • Insurance Calculator
    • Buy Car Insurance
    • Buy Motorcycle Insurance
    • Car Insurance Refund
    • Insurance NCD Checker
    • Used Car Loan and Transfer
    • Car Market Value Guide
    • Car Comparison Tool
    • TNB Bill Calculator

Home / Search results for 'lrt3'

  • Projek LRT3 capai 98% kemajuan setakat ini, dijadual bakal beroperasi mulai 30 September ini -MOT

    28 February 2025 / 0 comments

    Kementerian Pengangkutan (MOT) mengesahkan perkhidmatan Transit Aliran Ringan 3 (LRT3) atau LRT Laluan Shah Alam yang menghubungkan Shah Alam dengan kawasan sekitarnya dijadualkan bakal beroperasi mulai 30 September 2025. Buat setakat ini, kemajuan keseluruhan projek […]
     


  • LRT3 99% complete, to start operating Sept 30 – Loke

    27 February 2025 / 4 comments

    The 37.8-km LRT3 Shah Alam line is now 99% complete and is set to start operating on September 30, transport minister Anthony Loke has said, according to The Edge. The line, which connects Bandar Utama […]
     


  • LRT3 Shah Alam line to be operational by Q3 2025

    5 February 2025 / 14 comments

    Initially set for opening in March, the LRT3 Shah Alam Line has been revealed to commence operations in the third quarter of this year, with physical work on the train line having reached 95% completion […]
     


  • Five revived LRT3 stations to cost additional RM5.3 bil – completion by Q4 2027, operational by Q2 2028

    29 October 2024 / 2 comments

    The construction of the five Light Rail Transit 3 (LRT3) stations, which were revived after being cancelled previously, will now cost the entire project an additional RM5.3 billion. This is according to deputy transport minister […]
     


  • LRT3: Pembinaan 5 stesen yang dibatalkan sebelum ini dijangka siap dan beroperasi pada Q2 2028 – MoT

    28 October 2024 / 0 comments

    Pembinaan lima stesen Transit Aliran Ringan 3 (LRT3) yang dibatalkan sebelum ini, dijangka siap dan bakal beroperasi pada suku kedua (Q2) 2028, kata Timbalan Menteri Pengangkutan (MoT) Datuk Hasbi Habibollah. Beliau berkata Prasarana Malaysia Berhad […]
     


  • EV feeder buses for LRT3 Shah Alam Line in Q3 2025 approved – 3 charging depots for the electric buses

    30 July 2024 / 0 comments

    The LRT3 Shah Alam Line will be supported by a 150-unit fleet of electric-powered feeder buses when it starts operating in the third quarter of 2025. The EV buses will have three charging depots and […]
     


  • Kos kembalikan 5 stesen LRT3 Laluan Shah Alam telan RM3.8b, termasuk sistem, tren, 150 bas pengantara EV

    29 July 2024 / 0 comments

    Ketika lawatannya ke Stesen Pasar Jawa LRT3 Laluan Shah Alam di Bandar Klang pagi tadi, menteri pengangkutan Anthony Loke turut mengumumkan bahawa Jemaah Menteri sudahpun meluluskan peruntukan untuk mengembalikan skop asal projek berkenaan menerusi mesyuarat […]
     


  • Cost to return LRT3 Shah Alam Line to original scope is RM3.8b – 5 stations, systems, trains, 150 EV buses

    29 July 2024 / 12 comments

    The cabinet has, in a meeting on July 5, approved a return to the original scope of the LRT3 Shah Alam Line project, which was announced in Budget 2024 by prime minister Datuk Seri Anwar […]
     


  • LRT3 Laluan Shah Alam bakal beroperasi pada suku ke-3 2025; 95% kerja fizikal siap sebelum ujian berjalan

    29 July 2024 / 0 comments

    Pagi ini Menteri Pengangkutan, Anthony Loke telah membuat tinjaun ke salah sebuah stesen LRT3 Laluan Shah Alam yang sedang dalam pembinaan, iaitu Stesen Pasar Jawa, Klang. Dalam sesi yang sama, Loke turut mengumumkan status projek […]
     


  • LRT3 Shah Alam Line to start operations in Q3 2025 – delay from March target, physical work 95% complete

    29 July 2024 / 11 comments

    The LRT3 Shah Alam Line will start operations in the third quarter of 2025, in August or September next year. This was revealed by transport minister Anthony Loke at the LRT3 Shah Alam Line’s Pasar […]
     


  • LRT3: Penutupan lorong, lencongan trafik di KM8.0-KM8.6 di Lebuhraya Persekutuan pada 29 Julai-31 Dis

    26 July 2024 / 0 comments

    Untuk pengguna Lebuhraya Persekutuan, ini ada makluman penting buat anda. Terdapat penutupan lorong dan lencongan trafik yang akan dilaksanakan di lebuhraya terbabit bermula hujung bulan ini untuk kerja-kerja pembinaan LRT Laluan Shah Alam atau LRT3. […]
     


  • Federal Highway lane closures, traffic diversions at KM8.0-KM8.6 for LRT3 construction, July 29-Dec 31

    26 July 2024 / 0 comments

    Federal Highway users, take note, as there are planned lane closures and traffic diversions on the route scheduled at the end of this month to facilitate construction for the LRT Shah Alam Line. According to […]
     


  • LRT3: Penutupan laluan, lencongan trafik di Damansara di Lebuhraya PLUS, SPRINT, 18-31 Julai

    16 July 2024 / 0 comments

    Penutupan 1 (kiri) & Penutupan 2 (kanan)- Klik untuk besarkan Setia Utama LRT 3 Sdn Bhd selaku pihak kontraktor bagi projek Transit Aliran Ringan 3 (LRT3) telah memaklumkan bahawa penutupan laluan dan lencongan trafik akan […]
     


  • Federal Highway lane closures, traffic diversions in Shah Alam for LRT3 construction – July 5-20 in stages

    4 July 2024 / 1 comment

    Stage 1, July 5-6 Federal Highway users, take note. There will be lane closures and traffic diversions this month to facilitate construction for the LRT3 project a.k.a. the LRT Shah Alam Line. According to contractor […]
     


  • Lane closures in Klang for LRT3 construction work

    27 June 2024 / 0 comments

    Slip roads in Lebuh Gambus, Klang, will see intermittent closures from Saturday, June 29 to Monday, July 1. This is to facilitate road works in connection with the Light Rail Transit 3 (LRT3) project. The […]
     


 
1 2 3 4 Next →

Search

 
 
 

Pandu Uji

  • TANGGAPAN AWAL: Chery Tiggo Cross 2025 di Malaysia – hibrid & turbo; bakal ‘kacau’ Ativa, WR-V?

    1st July 2025

     
  • PANDU UJI: Hyundai Santa Fe Turbo Hybrid 2024 — 1.6L cekap capai lebih 1,200 km; SUV paling jimat kini?

    20th May 2025

     
  • PANDU UJI: Chery Super Hybrid (CSH) hanya guna satu tangki petrol untuk perjalanan cecah 1,400 km!

    6th May 2025

     
  • PANDU UJI: Kia Sportage 2025 mempertaruhkan elemen keselesaan, gaya ranggi dan praktikaliti

    25th March 2025

     
  • PANDU UJI: Xpeng G6 menyerlahkan pengendalian impresif dan mempertaruhkan sentuhan imej minimalis

    22nd January 2025

     
  • Proton eMas 7 2025 — tanggapan awal pemanduan

    25th November 2024

     
  • PANDU UJI: Peugeot 408 GT — crossover bergaya, taruhan kebangkitan Peugeot yang akan berhasil?

    21st November 2024

     
  • PANDU UJI: Nissan Kicks e-Power — 129 PS/280 Nm, 900 km jarak; boleh lawan Honda HR-V e:HEV RS?

    14th November 2024

     
 
 
 
 
 
 
 
  • Home
  • About
  • Contact
  • Advertise
  • Terms Of Use
  • Anti-Bribery, Corruption & Whistleblowing Policy
  • Disclosure Policy
  • Privacy Notice
 

paultan.org

Copyright © 2025 Driven Communications Sdn. Bhd. 200801035597 (836938-P). All Rights Reserved.