Construction of JB-Singapore Rapid Transit System (RTS) Link starts – completion expected in Dec 2026

Construction of JB-Singapore Rapid Transit System (RTS) Link starts – completion expected in Dec 2026

The groundbreaking ceremony for the JB-Singapore Rapid Transit System (RTS) Link has happened at the upcoming Bukit Chagar customs, immigration and quarantine (CIQ) site in Johor Bahru, marking the start of construction of the RTS.

The rail line is expected to be ready in December 2026, and an estimated 150,000 people, which is half the number of people shuttling between JB and SG, are expected to use the RTS daily, said MRT Corp CEO Datuk Mohd Zarif Hashim.

“The RTS consists of four coaches. It can carry at least 250 people in one coach at one time – some 10,000 people an hour. Based on the number of people crossing the border previously, before its closure, we expect at least 150,000 people to use it daily,” he said, reported by The Star.

Construction of JB-Singapore Rapid Transit System (RTS) Link starts – completion expected in Dec 2026

“It will take only about five minutes to travel between Bukit Chagar station in Johor Bahru and Woodlands North station in Singapore. The frequency of the train will be 3.6 to six minutes, depending on whether it is during peak hour,” he added.

Mohd Zarif also said that the RTS will operate from 6am to midnight, and operation hours can be extended based on demand. 2026 is quite far down the road, and no info on fares have been shared. However, “we will ensure the ticket price is affordable,” the MRT Corp chief said.

In July, prime minister Tan Sri Muhyiddin Yassin and his Singapore counterpart Lee Hsien Loong met at the Causeway for a signing ceremony that marked the official resumption of the RTS Link project. Launched in 2018, RTS construction was scheduled to start in 2019 and slated for completion by December 2024. However, it was suspended in April 2019 at Malaysia’s request as the Pakatan Harapan administration reviewed all big projects.

Construction of JB-Singapore Rapid Transit System (RTS) Link starts – completion expected in Dec 2026

In its current form, the RTS project differs from the original plan. While the 10k passengers per hour capacity remains, the line will no longer leverage the Thomson-East Coast (TEL) MRT Line in Singapore. Instead, it will be a standalone LRT system. Also, instead of the TEL’s Mandai Depot, a new depot will be built in Wadi Hana, JB.

It will continue to feature co-location of CIQ facilities, so that passengers undergo clearance only once, at their point of departure. Each government has separately appointed an infrastructure company to fund, build, own, maintain and renew the civil infrastructure and stations in its territory up to the international boundary.

According to Mohd Zarif, Malaysia’s portion of the RTS cost of RM3.7 billion will include construction of the Bukit Chagar station and four-storey CIQ complex, the Wadi Hana depot, and viaducts through the JB city centre and over the Straits of Johor to the Malaysia-Singapore border. The Bukit Chagar hub will be a transit-oriented development with mixed property development and duty-free shops.

There will be an RTS Link station facade design competition, an idea mooted by Johor’s Sultan Ibrahim ibni Almarhum Sultan Iskandar.

Looking to sell your car? Sell it with Carro.

10% discount when you renew your car insurance

Compare prices between different insurer providers and use the promo code 'PAULTAN10' when you make your payment to save the most on your car insurance renewal compared to other competing services.

Car Insurance

Danny Tan

Danny Tan loves driving as much as he loves a certain herbal meat soup, and sweet engine music as much as drum beats. He has been in the auto industry since 2006, previously filling the pages of two motoring magazines before joining this website. Enjoys detailing the experience more than the technical details.

 

Comments

  • Ghani on Nov 23, 2020 at 4:12 pm

    Surely this gonna take more than 5 hours to travel between Bukit Chagar station in Johor Bahru and Woodlands North station in Singapore…. Since very single commuter gotta go thru covid screening and nose swab test..

    Like or Dislike: Thumb up 5 Thumb down 7
    • Lets See on Nov 23, 2020 at 4:31 pm

      Title says “…completion expected in Dec 2026” unless you expect Covid to continue until Dec 2026.

      Like or Dislike: Thumb up 3 Thumb down 0
    • Chong Sin Teck on Nov 23, 2020 at 5:06 pm

      Boss, we are talking about 2026…you are thinking too much already…

      Like or Dislike: Thumb up 8 Thumb down 0
    • Anencephaly.

      Like or Dislike: Thumb up 0 Thumb down 0
  • Ghani on Nov 23, 2020 at 4:17 pm

    If it doesn’t connect to an SMRT line, then what is the purpose of this standalone LRT? Connect to nowhere in Singapore?

    Like or Dislike: Thumb up 3 Thumb down 0
    • exactly, when high number of Singaporeans crossed over to JB side every day to work. better be well connected from Bukit Chagar Stn to their workplaces in factories, industrial kilang & gudang2 around Pasir Gudang, Kulai & Iskandar areas. Is ord tiring to wake up at 4am daily & 4+ hours of travelling a day to another country to work all the time. When finally back home, the sun’s already long set. The same cycle repeats tomorrow for these Singaporeans

      Like or Dislike: Thumb up 8 Thumb down 1
    • Ahmad on Nov 23, 2020 at 5:53 pm

      It connects to Woodland North MRT Station

      Like or Dislike: Thumb up 1 Thumb down 0
  • low2215 on Nov 23, 2020 at 5:39 pm

    Hopefully it will cont even if the existing gov is replaced . You know malaysia , whenever new gov comes , project will get cancelled ….

    Like or Dislike: Thumb up 2 Thumb down 0
 

Add a comment

required

required