Penang Bridge – sections of left lane closed in stages until August 30 to facilitate routine maintenance work

Penang Bridge – sections of left lane closed in stages until August 30 to facilitate routine maintenance work

Highway concessionaire PLUS has announced that the left lane at several locations on the Penang Bridge will be closed in stages until August 30 in order for routine under-bridge maintenance work to be carried out.

The left lane at these designated locations will be closed between 11 am and 3 pm daily except on Saturdays, Sundays and public holidays. Accordingly, PLUS has advised motorists using the Penang Bridge to plan their journey, follow all traffic signage and instructions given by on-site personnel.

Users are also advised to follow the PLUSTrafik Twitter page or download the PLUS Mobile App to get the latest traffic update on the Penang Bridge. The company added that the routine and maintenance work that is currently being carried out is unrelated to the Penang Bridge cable routine/maintenance work that was completed on July 31.

Looking to sell your car? Sell it with Carro.

10% discount when you renew your car insurance

Compare prices between different insurer providers and use the promo code 'PAULTAN10' when you make your payment to save the most on your car insurance renewal compared to other competing services.

Car Insurance

Anthony Lim

Anthony Lim believes that nothing is better than a good smoke and a car with character, with good handling aspects being top of the prize heap. Having spent more than a decade and a half with an English tabloid daily never being able to grasp the meaning of brevity or being succinct, he wags his tail furiously at the idea of waffling - in greater detail - about cars and all their intrinsic peculiarities here.

 

Comments

  • John May 9 Nangis on Aug 09, 2018 at 7:50 pm

    Such good planning by PLUS and the Penang Government to inform public about the disruptions to travel.

    Like or Dislike: Thumb up 0 Thumb down 0
  • Just kolos whole bridge lar. Then everyone can use 2nd bridge. More safer, coz alwiz got eksiden during such maintenance due to speed demons & alcoholic beverage demons.

    Like or Dislike: Thumb up 6 Thumb down 0
 

Add a comment

required

required